Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than a week ago
Candidate
Male, 49 years, born on 1 February 1976
Considers offers
Dzerzhinsk (Nizhny Novgorod Oblast), willing to relocate, prepared for business trips
Supervisor electrical construction department
Specializations:
- Other
Employment: full time
Work schedule: full day, rotation based work
Work experience 19 years 2 months
October 2021 — currently
3 years 7 months
«Nova Energies LLC» related to works at ARCTIC LNG2 PROGECT
Russia
Electrical and instrument Lead Inspector
Implementation of construction control over construction, according to approved design estimates and regulatory documents
• Checking the quality of work performed at the 35/10 kV substation, including equipment: power transformers SIEMENS, cells SIEMENS, SHNEIDER 10; 0.6; 0.4 kV, UPS, ABB frequency drives, followed by start-up and transfer to operation.
• checking the quality of work performed on the installation of cable support systems
• checking the quality of work performed on laying and connecting power and control cables
• checking the quality of work performed by the grounding and lightning protection systems.
• quality check of the performed works of the electric heating system of pipelines
• checking the quality of work performed by the lighting system
• verification and signing of as-built documentation
• Coordination of work with other specialists
• Enforcement of risks identification, analysis and assessment procedure implementation regarding all hazardous types of work
• Collaborate with experts by Technip (France)
• Working with forms of quality control in the EasyPlant system
February 2021 — September 2021
8 months
Joint-stock company KT - Kinetics Technology S.p.A., in Kstovo LLC Lukoil
Russia
Electrical Supervisor
• To conduct operational planning, coordination, organization and execute construction control of electrical works at the site.
• To check the steps of works with the right of signing documents proving the scope of works performed.
• To check and analyze construction design documents with further comments.
• To control over compliance with schedule of work.
• To execute technical supervision over the terms and quality of performing works, and their compliance with approved project documents, work drawings, construction norms, standards, and rules of the RF.
• To manage work on improving job management, cutting costs, and improving quality of electrical works, reducing their performance term.
• To execute control over timely completion of electrical works and transfer for commissioning.
• To execute control over receipt of drawings, schemes and technical conditions of equipment after they are assembled and installed (at the site).
• To draw up documents in area of responsibility
• To take part in investigating flaws, identified as a result of control and tests, and in developing measures on elimination of the flaws.
• To perform additional instructions of the line manager in the area of implementation of goals of the Project and the Branch Office in general.
• To perform other duties which are not listed in the article, and which however are included in the list of general duties of the Project, shall be performed on initiative basis and upon approval of the line manager.
November 2018 — January 2021
2 years 3 months
Branch of Joint-Stock Company "Daelim Industrial Co., Ltd." in Omsk Oil Refinery Project
Russia
Electrical Supervisor
• To conduct operational planning, coordination, organization and execute construction control of electrical works at the site.
• To check the steps of works with the right of signing documents proving the scope of works performed.
• To check and analyze construction design documents with further comments.
• To control over compliance with schedule of work.
• To execute technical supervision over the terms and quality of performing works, and their compliance with approved project documents, work drawings, construction norms, standards, and rules of the RF.
• To manage work on improving job management, cutting costs, and improving quality of electrical works, reducing their performance term.
• To execute control over timely completion of electrical works and transfer for commissioning.
• To execute control over receipt of drawings, schemes and technical conditions of equipment after they are assembled and installed (at the site).
• To draw up documents in area of responsibility
• To take part in investigating flaws, identified as a result of control and tests, and in developing measures on elimination of the flaws.
• To perform additional instructions of the line manager in the area of implementation of goals of the Project and the Branch Office in general.
• To perform other duties which are not listed in the article, and which however are included in the list of general duties of the Project, shall be performed on initiative basis and upon approval of the line manager.
February 2017 — October 2018
1 year 9 months
South Tambey LNG
Russia
QC Electrical Inspector
Implementation of construction control over construction, according to approved design estimates and regulatory documents
• Checking the quality of work performed at the 35/10 kV substation, including equipment: power transformers SIEMENS, cells SIEMENS, SHNEIDER 10; 0.6; 0.4 kV, UPS, ABB frequency drives, followed by start-up and transfer to operation.
• checking the quality of work performed on the installation of cable support systems
• checking the quality of work performed on laying and connecting power and control cables
• checking the quality of work performed by the grounding and lightning protection systems.
• quality check of the performed works of the electric heating system of pipelines
• checking the quality of work performed by the lighting system
• verification and signing of as-built documentation
• Coordination of work with other specialists
• Enforcement of risks identification, analysis and assessment procedure implementation regarding all hazardous types of work
• Collaborate with experts by Technip (France)
• Working with forms of quality control in the EasyPlant system
September 2014 — January 2017
2 years 5 months
SIBUR LLC "ZapSibNeftehim"
Russia
Construction Supervisor electrical
Coordination with other professionals
• Quality control of executed works
• Ensure the implementation of procedures to identify risks, their analysis and evaluation of all types of hazardous work
• Check that all the necessary permits to carry out works contractors
• Checking of work procedures, appropriate work permits and documents on the analysis of industrial safety
• Provision of the construction manager reports about the risks in the area of health, safety and environmental
• Participation in the preparation of weekly reports on the progress of work
• Verification of compliance of works with the approved drawings and specifications
• Acceptance of the executed works contractors
• Check the project documentation for the detection of errors and inconsistencies of the Russian Federation standards
• Collaborate with the experts of the company Linde (Germany)
October 2012 — September 2014
2 years
RusVinyl LLC IKRA PROJECT
Lead Supervisor- Electrical
• Coordination of work with other specialists
• Enforcement of risks identification, analysis and assessment procedure implementation regarding all hazardous types of work.
• Check if subcontractors have all necessary permitting documentation to execute works
• Verification of work performance procedure, relevant work permits and JSA documents.
• Reporting data about HSE risks to the Construction Manager.
• Participation in preparation of weekly progress reports.
• Check of works for compliance with approved drawings and technical specifications.
• Acceptance of works completed by contractors.
• Check the project documentation for the detection of errors and compliance with Russian standards
• Collaborate with experts by Technip (France)
• Installation of equipment manufacturers of ABB, ICET, YOKOGAWA. SCHNEIDER, SIEMENS.
• Supervision of installation and acceptance volume and quality of work performed substation 35/10 kV, including equipment: power transformers, the cell 10; 0.6; 0.4 kV, UPS, ABB frequency drive, with a subsequent start-up and transfer to Maintenance.
• Supervision of installation and acceptance volume and quality of work performed by mounting the cable carrier «Vergokan» systems
• Supervision of installation and acceptance volume and quality of work performed by laying and connection of power and control cables
• Supervision of installation and acceptance volume and quality of work performed grounding and lightning protection systems.
March 2006 — October 2012
6 years 8 months
OJSC «DVK»
Dzerzhinsk (Nizhny Novgorod Oblast)
Utilities... Show more
High voltage equipment expert
• Reparation and maintenance of the company’s power supply network 0,4-10 kV
• Reparation and maintenance of pumping equipment
• Maintenance of a main step-down substation 110/10 kV
• Tasks distribution and work process follow-up
• Drawing up and keeping documentation
Skills
Skill proficiency levels
About me
Professional skills: Exactingness towards myself and the subordinate personnel, responsibility, ability to manage any situation, constant development of personal skills.
Personal skills: efficient, ambitious, vigorous and sympathetic.
Higher education
2024
Nizhny Novgorod State University of Architecture and Civil Engineering
1998
Technical college of Dzerzhinsk
electrician specializing in Erection and commissioning of electrical equipment of industrial and civilian units., electrical technician
Languages
Citizenship, travel time to work
Citizenship: Russia
Permission to work: Russia
Desired travel time to work: Doesn't matter