Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online less than a week ago

Candidate

Male, 54 years, born on 2 February 1971

Considers offers

Moscow, willing to relocate (Other regions), prepared for business trips

The approximate area of the job search is specified

Manager, supervisor, engineer, workover, drilling and completion, ENG

Specializations:
  • Other

Employment: full time, part time, project work

Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work

Work experience 36 years 6 months

April 2023currently
2 years 1 month
Mitro International Limited

Turkmenistan

Oil and Gas... Show more

Drilling and Workover Engeneer
Coordination of personnel of contracting companies for well interventions and field operations. Work with contractors to clarify the necessary of equipment, materials, during well preparation to hydraulic fracturing and due main operation of hydraulic fracturing. Work with Well testing and Well completion teams at the well after hydraulic fracturing.
June 2021March 2023
1 year 10 months
Perfobur

Moscow, perfobur.com

Oil and Gas... Show more

Field service manager
Coordination operation and work with fild team. Organization and planing operation at the fild of Russia and abroad. Job programm preparation. Job selection work. Participation in the discussion of the work performed and the lessons learned from the operations. Mentoring newly hired workers. Training and knowledge testing.
January 2018June 2021
3 years 6 months
SPIE Oil & Gas Services, Dubai

Iraq, www.spie.com/

Oil and Gas... Show more

Workover, completion and Rigless supervisor
SPIE Oil & Gas Services - West Qurna-2 Project IRAQI Position: Workover and Rigless supervisor Continued to get involved in various operations. Continued worked at out-staff position at WQ-2 with same as previous before at this field. Worked with teams on the drilling rig, coil tubing, conduct WO, rig less and completion operation at the well. Main works conducted at 600/800Hp joystick double Rigs. Completed the well, at XJ-2000Hp joystick triple Rig+TDS hydraulic Catwalk, with abnormal reservoir pressure at Yamama formation, temperature and hydrogen sulfide (Hi pressure / HP, Hi temperature / HT and H2S). Testing the well with WFD team and downhole equipment. Me response to Well Control, PTW control, Emergency, Safety and Incident management. Monitoring the production of drilling, completion and stimulation and well inflows. Also, monitoring of work to increase oil recovery, killing and servicing wells with or without drilling rig installation, SL and WL operations, Well testing also. Work with Open Wells well database software. Planning future operations, materials, equipment and logistic. Conducting Well Control drill, training personal with my and company experience. Lesson Learn and training personal according that. Participation in Well control drills and safety meetings to discuss, analyze risks and work on current and planned wells. Participation in Well control drills and safety meetings to discuss, analyze risks and work on current and planned wells. Monitoring the work of third-party contractors and subcontractors. Coordination of work on the site of all involved structures and performers in accordance with approved plans and schedules. Material control over the consumption of used materials, equipment and vehicle. Daily meetings with management and reporting in the prescribed manner. Conducting and participating in PJSM and other meetings for safe and trouble-free performance of work and compliance with safety regulations in accordance with company standards and rules. Monitoring of applications and their implementation by units involved in well operations. Daily discussion and adjustment of the team’s action plan for work performed, with discussion of all involved and involved units in simultaneous work. Monitoring the conditions of blowout equipment (BOP), staff training and readiness for oil and gas kick and its elimination. Conducting and carrying out training drills or alarms on Shut in, Choke, BOP, H2S and other drill at a location. Carrying out and monitoring of drilling operations, consisting of a series of works on the drilling of new wells, TIH and install casing and casing elements, casing spool and connections, liners both perforated and cemented, equipped with different wells and bottom equipment, valves and packers. Conducting and monitoring completion of wells with normalization of the bottom hole after drilling both cased hole and in the open wellbore. Install of the lower, intermediate and upper completions into wells with various tooling elements (Various hangers, DHPG, SSD, TRSSSV and others). Sealing the wellbore after completing the well and installing fountain fittings with adapters of various electric and hydraulic lines. Conducting and monitoring work on the extraction of downhole equipment using various fishing tools of various types and designs. Supervision of work to stimulate well inflow, using Coil Tubing equipment and geophysical hoists (Coil tubing, Slick Line and Wire Line) using different fluid and HCL acid for acidizing operation and frack. Achievements: 1. Completed and tested the well from the drilling rig of the first well in the Yamama horizon with abnormal pressure-HP, abnormal temperature HT and hydrogen sulfide-H2S, for the first time in the region. 2. Testing and completion of a well with a horizontal section with swellable packers and shut-off valves, SSD-open interval ports installed when working with a coiltubing unit from a workover rig. 3. Elimination of accidents with packer equipment with a damaged upper part of the production string.
March 2019September 2020
1 year 7 months
Lukoil-TengizChevrOil

Atyrau, tengizchevroil.com

Oil and Gas... Show more

Drill Site Representative/Manager
Lukoil-TengizChevrOil-Kazakhstan, Atyrau, Tengiz Position:Drill Site Representative / DSR. LUKOIL employee, but I work at the invitation of the Chevron operator in a joint US-Kazakh company Tengizchevroil in the Republic of Kazakhstan, at one of the largest fields - Tengiz (Company owns part of project). Field with abnormal reservoir pressure, temperature and hydrogen sulfide (Hi pressure / HP, Hi temperature / HT and H2S). Current position Drill Site Representative / DSR. Drilling Rig driving: The main work this is the Heaviest Workovers, also drilling and sidetracks, is carried out with the Academy/Dreco-1500AC joystick triple RIG, with TDS and a hydraulic Catwalk. The rig is equipped IV class of BOP with a Toga degasser system (H2S) and an electric fire stick burner. Drilling and completion are carried out using VD OBM or Mi SWACO's HS and Micromax and Houston special completion fluids. Sidetracks drillin and completion works conduct with equipment to reduce fluid leaked and control bottom hole pressure using closed hole circulation and nitrogen circulation (CHCD and NCD) drilling technologies using the RCD-Rotation Circulation Device / WFD equipment and Nitrogen station/SLB equipment. Fluid level into well control control also with SLB echo-miter. Me response to Well Control, monitoring the production of drilling, completion, stimulation, different SL and WL Logging, Giro, perforation, Well Testing and inflows also.Control, collect and sending to the customer core samples after drilling. Work with PTW system, open and close PTW, monitor block and switch energy equipment and control that. Hazards analysis during operations and elimination injuries, failure etc. Emergency and safety management. Also, monitoring of work to increase oil recovery, killing and servicing wells with or without drilling rig installation. Work with Well View well database software (trained and worked with Landmark/Open Wells too). Planning future operations, materials, equipment and logistic. Conducting Well Control drill, training personal with my and company experience. Lesson Learn and training personal according that. Participation in Well control drills and safety meetings to discuss, analyze risks and work on current and planned wells. Monitoring the work of third-party contractors and subcontractors. Coordination of work on the site of all involved structures and performers in accordance with approved plans and schedules. Material control over the consumption of used materials, equipment and vehicle. Daily meetings with management and reporting in the prescribed manner. Conducting and participating in PJSM and other meetings for safe and trouble-free performance of work and compliance with safety regulations in accordance with company standards and rules. Monitoring of applications and their implementation by units involved in well operations. Daily discussion and adjustment of the team’s action plan for work performed, with discussion of all involved and involved units in simultaneous work (POA / Plan of operation actions). Monitoring the conditions of blowout equipment (BOP), staff training and readiness for oil and gas kick and its elimination. Conducting and carrying out training drills or alarms on Shut in, Choke, BOP, H2S and other drill at a location. Carrying out and monitoring of drilling operations, consisting of a series of works on the drilling of new wells, TIH and install casing and casing elements, casing spool and connections, liners both perforated and cemented, equipped with Slide Door valves (SSD) and Swell packers. Drilling sidetracks, with the TIH of the listed above equipment or an open hole. Preparing and conducted several Gravel Pack operations after drilling new wells. Conducting and monitoring work on the extraction of downhole equipment using various casing/tubing cutters (MPC, WHC, RCT), as well as elements of casings and rigging of liners. Conducting trouble operations in the well using fishing tools of various types and designs. Conducting and monitoring completion of wells with normalization of the bottom hole after drilling both cased hole and in the open wellbore. Install of the lower, intermediate and upper completions into wells with various tooling elements (Various hangers, DHPG, SSD, TRSSSV and others). Sealing the wellbore after complete the well and installing fountain fittings with adapters of various electric and hydraulic lines. Supervision of work to stimulate well inflow, using Coil Tubing equipment and geophysical hoists (Coil tubing, Slick Line and Wire Line) of Schlumberger company using STC fluid (Sweetened Tengiz Crude) and HCL acid for acidizing operation and frack. Work with Gravel Pack downhole equipment. Achievements: 1. The first well workover in the field was carried out with totally losses the well-killing fluid, using a set of RCD equipment and all TIH and TOH was conducted with the installation of a nitrogen cap, for the first time in the region (NCD equipment). 2. Drilling 3 wells with GRAVPAK completion for the first time in the region. 3. Completion of wells with ESP, from a drilling rig and for the first time in the region. 4. Relocation of a drilling rig in the field in the shortest possible time - 5 days, for the first time in the field. 5. Sidetrack was conducted using a cemented whipstock for the first time in the field. 6. Carrying out emergency operations on the well with determining the depth of sticking of the emergency liner by the geophysical party through the Top Drive, for the first time in the field. 7. Combined sidetrack drilling and completion using relevant technologies CHCD-Closed Circulation Well and NCD-Nitrogen Cap Drilling.
April 2013January 2018
4 years 10 months
Lukoil-overseas, Dubai

Iraq, www.lukoil-overseas.ru

Oil and Gas... Show more

Workover, completion and Rigless supervisor
Lukoil-overseas - West Qurna-2 Project IRAQ Position: Workover and Rigless supervisor Working with teams on the joystick double drilling rig XJ-750 and ZJ-60 (China-Time Rolling), c 13 " BOP, (annular BOP + 2 piper rums), a full-featured circulation system to 300m3, with full cleaning unit (shale shaker, vacuum degasser, Poor boy, etc.). Conducted completion from drilling rig XJ-1600, RIH drilling equipment and the preparation work for the well completion Low and Upper. Supervising workover and well completion operations from drilling rig, Slick line and Ware line operations, Data Open Well, NF and ESP Smart and Y-tool completion. Repair and completion exploration well, water well, well testing, work to eliminate accidents and complications, as well as monitoring of all ongoing work on the completion and workover, perforation of wells, monitoring of geophysical work, coiled tubing operation, flushing and stimulation, well treating acid. Conduct various works on wells without workover crew-Rig less operations (maintenance and repair wellhead equipment, works on research of wells, work stimulation, etc). Starting to work with 4 new rigs and 4 use rigs at fields. Me response to Well Control, monitoring the production of drilling, completion and stimulation and well inflows. Work with PTW system, open and close PTW, monitor block and switch energy equipment and control that. Hazards analysis during operations and elimination injuries, failure etc. Emergency and safety management. Also, monitoring of work to increase oil recovery, killing and servicing wells with or without drilling rig installation. Work with Open Wells well database software. Planning future operations, materials, equipment and logistic. Conducting Well Control drill and training personal, Lesson Learn. Participation in Well control drills and safety meetings to discuss, analyze risks and work on current and planned wells. Monitoring the work of third-party contractors and subcontractors. Reported and control of the material on the works. The operations performed with the mobile drilling rigs. Supervision of work to stimulate well inflow, using Coil Tubing equipment and geophysical hoists (Coil tubing, Slick Line and Wire Line) using different fluid and HCL acid for acidizing operation and frack. Achievements: 1. Starting from scratch 4 workover crews with Arab and Chinese personnel. 2. Completion and testing of the first production well in the field. 3. Completion of the first ESP well in the field with a Y-tool block. 4. Completion of the first production well in the field using SMART technology. 5. Completion of injection wells in the wells field using SMART technology. 6. Elimination of the accident in the well 245mmX178mmX102mm with a PDC-89mm bit. 7. Organization and performance of work to normalize the bottom of the well with lowering the line under pressure and return circulation through the BOP.
June 2007April 2013
5 years 11 months

Moscow, www.salympetroleum.ru

Oil and Gas... Show more

Supervisor, Completion and Workover Engineer
Salym Petroleum Development, Salym, Russia Position:Supervisor, Completion and Workover Engineer All the following are some new technologies + Controlling and supervising workover and well completion operations. Drawing up of the report on the done work in English. Work with English-speaking PC operational system. The Y-Tool Technology, Smart Well, PLT c ESP as well as standard and ESP, completions injection wells. Repair work in the well of varying complexity: RIRs, insulation Swell-Fix c swellable elements, acid treatment and jamming with the injection of CWS. Various underbalanced perforation, including GAS and MAXAR. S fishing operations in the wells of standard and emergency equipment. Doing various documents on wells, work with domestic and foreign contractors. Different fishing and milling operations. Achievements: 1. Completion of a production well using SMART technology, the first in region. 2. Completion of an injection well using SMART technology, the first in region. 3. Working together with the specialists of the Tubing Metallurgical Company / TMK and Weatherford / WFD to identify the problems of running tubing with controlled make-up torque. NKM type connections with Premium connection thread type (ore same), into wells. This connection was one of the first Russian developments with a highly hermetic metal-to-metal seal of the Vantop / VanTop type. TMK conducted a test at our field. 4. Completion of the first well in Russia using PLT+ESP / Production Login Tool technology. This equipment was the first development in Russia and the world. 5. The fastest ESP well completion after drilling by the workover team - 57.5 !!! hours. It was carried out with a relocation and the use of the APRS-80 machine and perforation using the APS / Anker Perforation System technology. 6. Organization and implementation of work to increase the acceptability of injection wells with mini-hydraulic fracturing units PU-700, the first in the field.
April 2006June 2007
1 year 3 months
ТНК-Нижневартовское НГДП

Nizhnevartovsk

Oil and Gas... Show more

Fracturing and Coil Tubing Supervisor
TNK-BP, Nizhnevartovsk, Russia Position:Fracturing and Coil Tubing Supervisor Controlling and supervising workover and well completion operations. In charge of workover and well completion for hydraulic fracturing. Control of overall frac job performance; post frac analysis and reporting. Cooperation with frac contractors: Halliburton, Newco Well Service, BJ Services, CatOb-Neft. Acquainted with new frac technology – Surgi Frac (Halliburton) – new method of fracturing horizontal wells in West Siberia. Supervising fishing jobs including complex fishing jobs with participation of Weatherford Fishing Services (packer milling out, ESP and SRP fishing etc.) Supervising coiled tubing and nitrogen jobs such as: post frac sand washing out, well killing, unloading well with nitrogen, acid stimulation jobs Material consumption control. Different fishing and milling operations. Achievements: 1. Preparation and execution of hydraulic fracturing at a well for 300 tons of proppant. The first in the region. 2. Preparation and implementation of 2 complex hydraulic fracturing, for 3 well intervals, with the participation of a workover team using Surge Frack technology / Surgical hydraulic fracturing with interval injection and hydrosand-jet perforation. The first in Russia. 3. Drilling the second wellbore bypassing the emergency area and completing the well with an open bottom and hydraulic fracturing from the workover rig A-50U. The work was carried out and organized entirely with the participation of only the workover workshop, and using standard equipment and workover fluids without the involvement of specialized contractors. 4. Elimination of an accident in a well with an abandoned coil-tubing pipe, during development after hydraulic fracturing. 5. Performing hydraulic fracturing for 30 tons with injection "in Flow" for the first time in the region.
November 2004April 2006
1 year 6 months
ТНК-Нижневартовское НГДП

Oil and Gas... Show more

Workover Supervisor.
Contractor monitoring. Carrying out and supervising Workover operations of increased complexity, monitoring, presence and confirmation of specific technological operations. Coordination of Rig with other contractors. Well repair by RIH of additional casing and cementing of casings. Recovery circulation. Determining the feasibility of carrying out work and making decisions on conducting current and further workovers operations on the wells. Monitoring of the state of health and safety in teams, the compliance of work safety, rules, etc. Change of work plans in accordance with the actual circumstances of the wells. Participation and monitoring of Cementing squeezing and hydraulic fracturing of contractors. Supervised work on sidetracking wells. One of the well operations bypassing the emergency section was carried out in full from the Workover single Rig, using standard workover equipment Achievements: 1. Organization and conducted of work to normalize the bottom of the well after hydraulic fracturing with full losses using for open circulation degassed oil. 2. Recovery circulation and carrying out emergency work on a well equipped with a sucker-rod pumping pump with non-standard solutions for extracting gas pumping units. 3. Well preparation and completion after hydraulic fracturing for 150 tons with the solution of problems of normalization of the bottom of the proppant coated with Rubber Coat / Rubber coating.
January 2003November 2004
1 year 11 months

Nizhnevartovsk, snph.biz/

Mining Industry... Show more

Deputy Head, Head of Section of Workover
Overall managing of WO rigs performance; coordination of Technological, Geological and Transportation Department activities. Designation of objectives and requirements for effective work completion. Making decision concerning job feasibility. Controlling and approving job programs. Work at the fields of Rosneft and Gazprom with gas wells with abnormal pressures and temperatures and hydrate formation Achievements: 1. Organization and starting to work of a workover saction at the Komsomolskoye field. 2. Organization of Workover work base at the Kharampurskoye field. 3. Organization of the Technical section of workover at the Samotlor field. 4. Well preparation for hydraulic fracturing and hydraulic fracturing at the Barsukovskoye field with fully russian equipment and chemicals.
July 2002January 2003
7 months
СибКарс

Gubkinsky

Oil and Gas... Show more

Shift workover supervisor, workover technologist
Organizing and controlling workover performance and job execution. Coordination between various well services; organization of material and equipment distribution and support to WO rigs. Gathering and writing daily reports, interaction with various departments (geologists, technologists etc.) Achievements: 1. Organization of the Technical section of workover at the Samotlor field.
November 2001July 2002
9 months
СибКарс

Nizhnevartovsk

Oil and Gas... Show more

Senior tool pusher of workover
Supervision of complex workover operations: remedial cementing, acid stimulations and fishing. Planning fishing techniques; fishing tool design and selection.
August 2000September 2001
1 year 2 months
ТНК-Самотлорское НГДП

Nizhnevartovsk

Oil and Gas... Show more

Workover supervisor
Monitoring the work of contractors: Carrying out and supervising workover operation of increased complexity, monitoring, presence and confirmation of specific technological operations. Drawing up work plans for wells.
September 1994August 2000
6 years
Нижневартовское НГДУ

Nizhnevartovsk

Oil and Gas... Show more

Assistant driller, Driller, Tool pusher
Workover of production wells , sucker rod pumps, ESP and gas lift, jet pumps and water injection wells, well completion for frac jobs etc. Fishing, well cleaning up, casing leak detection. Committed to safe and trouble free workover performance.
May 1992September 1994
2 years 5 months
Белозёрное НГДУ

Nizhnevartovsk

Oil and Gas... Show more

Production operator, Booster station operator
Maintenance of wells and booster pump station
June 1991May 1992
1 year
Нижневартовское УБР-3

Raduzhny (Khanty-Mansi AO – Yugra)

Oil and Gas... Show more

Assistant driller
Jobs in the drilling team to drill exploratory wells, and operational
February 1989June 1991
2 years 5 months
Варьёганское УБР

Raduzhny (Khanty-Mansi AO – Yugra)

Oil and Gas... Show more

Assistant driller
Jobs in the drilling team to drill exploratory wells, and operational
October 1988February 1989
5 months
УМ-19, трест Самотлортрубопроводстрой

Nizhnevartovsk

Oil and Gas... Show more

Field unit mechanic
Practical experience in the repair and maintenance of different oil units and vehicles

Skills

Skill proficiency levels
Контроль качества
Контроль исправности оборудования
Английский язык
Ремонтные работы
MS Word
Руководство коллективом
Организаторские навыки
Управление производственным персоналом
Водительское удостоверение категории B
Обучение и развитие
Техническая эксплуатация
Обучение персонала
Работа в команде
Производственное планирование
Материально-техническое обеспечение
Планирование
Телефонные переговоры
Быстрое принятие решений в критических ситуациях
Анализ данных
Редактирование текстов на иностранном языке
MS Outlook
Пользователь ПК
Капитальный ремонт

About me

Conduct drilling operation different well and side trucks also with HP,HT and H2S.Make repairs, completions (and secondary too) of varying complexity of almost all types of production and injection wells with very different X-tree (surface equipment) and downhole completion (underground equipment ), as well RIH for additional well screen, additional oil string, liners and production liner, with a packer and without, and cemented to the open hole. Spent working correctional cementing (squeeze job) and grouting, the RIH of different of various insulating packer layouts as much, and with Swell Fix (swelling packer elements), retainer assembly. Supervised the brine site, for the preparation of various salt brines, and VP (Viscosity pills). Went through the whole chain of (in practice) from the construction of well (drilling) to prepare-pumping merchantable oil at booster station. I have a huge store of knowledge in the profession of both theoretical and practical evidenced by certificates of training and education. No problem for the transfer of reports and reporting in Well View and Open Wells. The main experience of work on Workover and the Wells completions. Perform a lot of different fishing and milling operations also with hard and heavy workover at 300t drilling rig. Work to eliminate accidents with bottom hole assembly and pumping equipment (Extract ore milling for rotary table and Top drive (TD) Workover). Have experience of Completion from the Drilling rig. I have experience in hydraulic fracturing and Coil tubing. Make repairs ESP, Injection Smart and Y-tool well assembly. Lust time make completions with NF and ESP equipment. Conduct well completion ESP with install Low and Upper equipment. Experience more than 30 years in Oil industry and more then 28 at rig site - Drilling, Completion and WO.

Portfolio

Higher education

2000
Tyumen Oil and Gas University
Drilling engineer, specialization of Workover
1990
Nizhnevartovsk Oil Technical School
Drilling technician, Oil technician

Languages

RussianNative


EnglishC2 — Proficiency


Professional development, courses

2024
IWCF
RSTS, Well control
2019
Tengiz Training Center, Tengiz
Tengiz Training Center, Fire safety
2019
Tengiz Training Center
Учебный центр АктивБезопасность, Safety driving course
2019
Tengiz Training Center
Tengiz Training Center, Lifting operation course
2019
Tengiz Training Center
Tengiz Training Center, Permit To Work and Hazards analysis course,
2019
Tengiz Training Center
Tengiz Training Center, Working at Heights course
2019
Tengiz Akbarys Training
Tengiz Akbarys Training, H2S awareness &SCBA/SABA respiratory protection practical training
2019
Chevron Training Center
Chevron Training Center, Well Control course IADC
2018
Restrata training center
Restrata training center, H2S awareness practical training, Basra WQ-2
2016
Упрвление скважиной при ГНВП по версии IWCF
AST (Астрахань-Бузулук), Сертификат
2014
Open Well
Halliburton, Работа с программой Open Well
2013
Упрвление скважиной при ГНВП по версии IWCF
Губкинский Университет, свидетельство
2011
Геофизические исследования скважин
Томский Университет (Хрриот-Ватт), сертификат
2011
Итерпритация каротажных диаграмм
Томский Университет (Хрриот-Ватт), сертификат
2011
Английский язык методом погружения
Свобода Слова, сертификат
2011
Управление опасными рисками на производстве
SPD, сертификат
2011
Лидерский аудит безопасности
SPD (Safety Manadgement Consultants UK LTD 1-2 part), сертификат
2010
Английский язык методом погружения
Hilton, сертификат
2010
Курс по заканчиванию скважин
Учебный центр ШЕЛЛ в Нидерландах Райсвик, сертификат
2010
Курс по жидкостям для заканчивания скважин
Учебный центр ШЕЛЛ в Нидерландах Райсвик, сертификат
2010
Курс по основам управления электронной базой данных EDM в Open well
Учебный центр Халибуртона в Тюмени, сертификат
2009
Супервайзинг в бурении и заканчивании скважин
Губкинский Университет, свидетельство
2009
Курсы защитного вождения "лето"
Учебный центр АктивБезопасность, сертификат
2009
Супервайзинг при бурении и заканчивании скважин
Губкинский Университет, свидетельство
2009
Экологическая безопасность в области управления отходами
Московский институт пищевой промышленности, сертификат
2009
Английский язык
Тюменскии государственный университет, сертификат
2008
Буровые растворы нового поколения
Губкинский Университет, свидетельство
2008
Технология заканчивания скважин
Росийско-Канадский УЦ, сертификат
2008
Английский
CET scool, сертификат
2008
Английский
Hilton, сертификат
2008
Курсы защитного вождения "зима"
Учебный центр АктивБезопасность, сертификат
2006
Курсы по заканчиванию скважин
МICWACO, сертификат
2005
Курсы по ГРП и Стимплану
NCI, сертификат
2001
Курсы супервайзеров по КРС и бурению
Халибуртон, сертификаты

Tests, examinations

2024
IWCF
RSTS, Dubai, Well control
2016
Управление скважиной при НГП (версия IWSF)
AST (Астрахань-Бузулук), сертификат
2013
Управление скважиной при НГП (версия IWSF)
Губкинский Университет, Сертификат
2011
Управление скважиной при НГП (версия IWSF)
Губкинский Университет, сертификат
2009
Экологическая безопасность в области управления отходами
Московский институт пищевой промышленности, сертификат
2009
Управление скважиной при НГП (версия IWSF)
Губкинский Университет, сертификат
2008
Пожарно-технический минимум
Нефтеюганский институт прогнозирования и развития, удостоверение
2007
Управление скважиной при НГП
Региональный центр ДО, свидетельство
2007
Допуск в зону ПВР
Региональный центр ДО, удостоверение
2007
Промбезопасность
Нефтеюганский институт прогнозирования и развития, удостоверение
2007
Управление скважиной при НГП (версия IWSF)
Губкинский Университет, сертификат
2001
Управление скважиной при НГП (версия AIDC)
Parker training center, сертификат
2001
Управление скважиной при НГП (версия IWSF)
Губкинский Университет, сертификат
1999
Допуск к отбору проб на загазованность (российские приборы)
Региональный центр ДО, удостоверение

Citizenship, travel time to work

Citizenship: Russia

Permission to work: Iraq, Russia, Turkmenistan

Desired travel time to work: Doesn't matter